It's a while since I've posted any pictures from the site so here's an update of what's been going on over the past few weeks:
The rock bolting on the cliff face next to terrace D has been completed. The rock can now be left exposed rather than being covered in safety netting. |
These are the last few rock bolts going in. The stone buttress just above here will be pointed. |
The rock on the right is to be broken up smaller and used to fill gabion baskets |
The foundations for terrace F are taking shape |
...and a huge manhole is being constructed to take the sewage down from Mill Lane to Forgebank Walk |
this shows the square at the east end of terrace B |
in terrace A, boxes for the doors and windows have been installed |
...whilst those for the other terraces are being made in the Mill. You can see the wood chip store and boiler house being built in the background |
Nothing happening at the boathouse yet - but we are sorting out the Environment Agency consent for the viewing platform which will run along the south side of the building overlooking the river |
www.lancastercohousing.org.uk
Great to see work progressing inside the mill as well. I did not know we were to have a viewing platform on the boathouse so that was a very nice surprise.
ReplyDeleteThanks for the photos Jon much appreciated